New Construction · Hialeah

Metro Parc North Hialeah: Facts, Rents & Lease Guide

A buyer's guide to Metro Parc North in Hialeah: current pricing, floor plans, the completion timeline, and what to know before you commit capital.

Rents on request Starting price
661 rental apartments Residences
8 Floors
Late 2027 (est.) Est. completion

The project

Metro Parc North is Baron Property Group's 661-unit, 8-story transit-oriented rental apartment project at 955 E 26th Street in Hialeah, Phase 2 of its Metro Center development beside the 559-unit Metro Parc. Groundbreaking was held in February 2025 and the building topped out in late March 2026.

Studios to three-bedroom rentals with more than 15,000 square feet of retail sit adjacent to the Hialeah Metrorail and Tri-Rail station. Rents are not yet published with completion guided to late 2027; as a rental project it is evaluated through the lease market, not a condo purchase.

Metro Parc North, Hialeah

Project snapshot

Metro Parc North at a glance.

The facts below are drawn from this guide and from the developer's published materials. Where a fact is not verified, the page says so plainly rather than guessing.

Location / County
Hialeah, Miami-Dade County
Residence types
Studio-3 bedroom rentals
Status
Under Construction
Estimated completion
Late 2027 (est.)
Published pricing
Rents not yet published
Developer
Baron Property Group
Rental restrictions
Residential leases set by the landlord at launch

Information reviewed October 2026. Prices, availability, and completion dates change frequently. Confirm current terms with the developer or a licensed advisor.

Sources consulted for this guide

Source links open in a new tab and are provided for verification only. Facts carry the verification date recorded above; prices, availability, and timelines change and require sales-gallery confirmation.

Verified facts carry the source links above, each pointing to the original public source where one is available. Everything else on this page is marked Not verified or Contact for current information. This page never hosts or hotlinks external files, renderings, brochures, or floor plans; where a document exists only on the developer's site, the source link above is the reference.

At a glance

Metro Parc North in Hialeah, in numbers.

County

Miami-Dade

City

Hialeah

Neighborhood

Hialeah

Developer

Baron Property Group

Address

955 E 26th Street, Hialeah, FL (earlier filings cited 983 E 26th Street)

Price range

Rental community; rents not yet published

Starting price

Rents on request

Residences

661 rental apartments

Floors

8

Sales availability

Rental lease-up planned; topped out late March 2026

Est. completion

Late 2027 (est.)

Residence types

Studio-3 bedroom rentals, Retail

Construction status

Under Construction

Property category

Rental apartments (mixed-use)

Design & architecture

Architecture by Modis Architects; general contractor KAST Construction

Official website

Contact for current information

Gallery

Renderings and interiors.

Developer renderings and interior imagery are updated as phases release. Current documents are shared privately with registered buyers.

Representative imagery of Hialeah; official renderings on request
Representative interior imagery; official renderings on request

Interior renderings on request

Floor plans on request

Pricing & availability

What Metro Parc North costs today.

The advertised starting price is the developer's published entry point. Available units, real pricing bands, and incentives change as phases sell, so we confirm current terms with the sales team before you commit capital.

Advertised starting price
Rents on request
Published price range
Rental community; rents not yet published
Available units / sales status
Rental lease-up planned; topped out late March 2026
Price by bedroom configuration
Rents not yet published; rental rate sheets will be requested once leasing launches
Penthouse pricing
Contact for current information
Deposit schedule
Rental community; no condo deposit schedule; application terms set by the property manager at leasing launch
Developer incentives
Contact for current information

Current pricing sheet for Metro Parc North.

Price lists, deposit schedules, and any developer incentives are shared privately with registered buyers after the sales team confirms today's numbers.

Request current pricing

Where a number is not published on this page, the row reads Contact for current information rather than guessing. Never treat an advertised starting price as the price of a specific available unit.

Architecture & residences

The building and residences at Metro Parc North.

The building profile below records what this page verifies about the tower and its residences: floor counts, unit mix, dimensions, finishes, and views. Anything the page does not state is marked Not verified rather than guessed. Layouts, dimensions, and pricing change as phases sell, so current floor plan documents, view matrices, and availability are shared with registered buyers.

Towers / floors
8
Total residences
661 rental apartments
Residence types
Studio-3 bedroom rentals, Retail
Square footage
Contact for current information
Ceiling heights
Not verified
Finishes
Not verified
Kitchens
Not verified
Baths
Not verified
Smart-home features
Not verified
Parking & storage
Not verified
Views
Not verified

The floor plans at Metro Parc North.

Layouts, dimensions, and pricing change as phases sell. We share current floor plan documents, view matrices, and availability with registered buyers.

01

Studio & One Bedroom

Studio-1 bedroom · On request

Rental plans across the 8-story building; dimensions shared by the leasing team once leasing opens.

02

Two & Three Bedroom

2-3 bedroom · On request

Larger family layouts; availability confirmed by the property team.

Full floor plan documents, view matrices, and current availability are shared privately with registered buyers.

Request floor plans

Amenities & lifestyle

The amenity program at Metro Parc North.

The list below records every amenity this page verifies for the project. Where the status of an amenity is not documented on this page, confirm with the sales team whether it is planned or already operating before you rely on it.

Transit-oriented location at the Hialeah Metrorail and Tri-Rail station

More than 15,000 sq ft of ground-floor retail

Adjacent to Hialeah Hospital

Construction & completion

Where Metro Parc North stands today.

Completion dates on new construction are estimates, not promises: they shift with permitting, financing, and the pace of the build. Announced milestones below are the ones this page records; anything unverified is marked plainly, and the current timeline should be confirmed with the developer before you plan around it.

Construction status
Under Construction
Estimated completion
Late 2027 (est.)
Announced milestones
Groundbreaking February 2025; full eight-story height reached late March 2026; completion guided to late 2027

Estimated completion is the developer's target as recorded on this page and is not a verified delivery date. Where the timeline is not verified, current scheduling requires confirmation with the project's sales team.

Location & neighborhood

Where Metro Parc North sits.

Address, neighborhood position, and nearby attractions below are recorded from this page's own project notes. Drive times, walk scores, and ratings are never invented on this site; where they are not documented here, the community guide is the best next step.

Street address
955 E 26th Street, Hialeah, FL (earlier filings cited 983 E 26th Street)
City
Hialeah
County
Miami-Dade
Neighborhood
Hialeah
Position & nearby
Phase 2 of the Metro Center development at the Hialeah Metrorail and Tri-Rail station, beside Hialeah Hospital
Transport notes
Adjacent to the Hialeah Metrorail and Tri-Rail station

Community guide

Hialeah

Neighborhood depth is being compiled for this area; the county new construction guide remains the best next step.

Ownership considerations

What to know before you commit.

General guidance for new construction buyers. Building-specific details are marked "Not verified" where they have not been confirmed for this project.

Short-term rental policy
Residential leases will be set by the landlord at leasing launch
Minimum rental period
Not verified
Leasing / owner-occupancy rules
Not verified; confirm current leasing and occupancy terms with the sales team
HOA / condo fees
Not published on this page; request the current budget before you commit
Financing notes
Not verified on this page; the deposit schedule above records the financing model this page states for the project, and loan terms are confirmed before contract

Closing costs

Florida buyer closing costs typically include title insurance, lender fees, county recording charges, prorated property taxes, and Florida documentary stamp tax on the purchase price. The exact figure for this project is not published on this page, so confirm the current estimate before you sign. Not verified.

Not verified

HOA and condo fees

New developments typically assess monthly HOA or condominium fees covering common areas, amenities, insurance, and building staff, with special assessments possible for capital projects. Monthly fees for this project are not published on this page; request the current budget. Not verified.

Not verified

Deposit process

Pre-construction purchases in Florida commonly require staged deposits across contract, groundbreaking, and closing milestones, held in escrow. The exact schedule for this project should be confirmed in writing with the developer before you commit. Not verified.

Not verified

Flood and wind insurance

Coastal Florida properties carry flood and windstorm insurance requirements that can add meaningfully to monthly carrying costs, and premiums have risen across the state. The current premium profile for this project is not published on this page; confirm with an insurance advisor. Not verified.

Not verified

Buyer questions

Metro Parc North, answered.

Pricing, deposits, timelines, the developer, and the investment case, answered directly. For the broader picture on South Florida new construction, browse the full FAQ hub.

New Construction South Florida FAQs

What is the construction status of Metro Parc North?

The project is under construction: groundbreaking was held February 2025 and the building topped out at its full eight stories in late March 2026.

When will Metro Parc North be completed?

Completion is guided to late 2027. Delivery dates shift with construction and permitting, so confirm the developer's current schedule before planning around it.

Is Metro Parc North a condominium?

No. Metro Parc North is a 661-unit rental apartment project, so the evaluation for clients is the lease market when leasing opens.

Who is developing Metro Parc North?

Baron Property Group is the developer, with a $206 million construction loan from Post Road Group; architecture is by Modis Architects and the contractor is KAST Construction.

Pre-construction access

Request pricing & floor plans for Metro Parc North.

Tell us the floor plans and views you are considering, and we will respond with current availability, pricing, deposit structure, and the contract terms that matter before you commit. Complete discretion, no obligation.

Current availability and pricing across the project

Deposit structure and contract terms, negotiated for you

Honest comparison against the resale market

Request pricing & floor plans: Metro Parc North

No obligation, complete discretion.

By submitting this form you consent to being contacted by Florida Luxury Real Estate (Realty ONE Group Evolution, d/b/a Kelby Contreras, P.A.) about your inquiry. Your details are kept confidential and are never shared or sold. Where a fact is not yet verified, we will say so and share current information on request.